COLLETT, UPPER MOUTERE
New Residence with Garage (BC & RC)
2013
South Elevation (12.01.2015)
Main Entrance (12.01.2015)
North Elevation (02.04.2014)
South Elevation (02.04.2014)
North Elevation (24.01.2014)
Walls up to 2.6m (24.01.2014)
Kids Bedroom Wing (22.09.2013)
Concrete slab with saw cuts (22.09.2013)
Foundation (15.08.2013)